Musaffah-Abu Dhabi-UAE-M37 +971 02 551 0247 estimating@specast.ae
Commercial Projects

76

Mosques

108

Private Villas

250

Click To Go Back

Emirates Palace Hotel extension included a Kids Nursery Palace building which was
designed to match existing decorative Glass Reinforced Concrete (GRC) items
with a special finish around the building.

Additionally, Specast manufactured and installed Glass Reinforced Plastic (GRP) Dome along with all steel
structures required for installation and mosaic tiling to reach the clients desired design and finishing.

Categories:
Glass Reinforced Concrete (GRC) - Supply & Installation
Glass Reinforced Plastic (GRP) – Supply & Installation
Client:
Emirates Palace Hotel
Consultants:
KEO
Contractor:
Lazourdy General Contracting
Location:
Abu Dhabi
Completed:
2023
Image

Specast Factory was established in 1975, and it was known as a factory for the production of artificial stone in the United Arab Emirates in general and in the Emirate of Abu Dhabi in particular, and Specast Factory has grown to become the leading factory in the production of building materials

Map

Contact Us

Musaffah-Abu Dhabi-UAE-M37

estimating@specast.ae

+971 02 551 0247

© Specast. All Rights Reserved.